目 录
第1章 工程造价管理概述 ··············································································1
1.1 工程造价含义与构成 ······································································1
1.1.1 工程造价基本含义 ·······························································2
1.1.2 工程造价的内涵及管理特点 ···················································2
1.2 工程造价的管理特性 ······································································3
1.2.1 工程造价的特性 ··································································3
1.2.2 工程造价形成的各主要阶段 ···················································4
1.2.3 工程造价的形成特点 ····························································6
1.3 工程造价计价依据 ·········································································8
1.3.1 工程造价管理的相关法律法规体系 ··········································9
1.3.2 工程造价管理标准和规范 ······················································9
1.3.3 工程定额 ·········································································10
1.3.4 工程造价信息 ···································································11
1.4 工程造价管理机构与执业资格制度 ··················································12
1.4.1 工程造价管理的机构体系 ····················································12
1.4.2 工程造价行业的执业资格制度 ··············································15
本章思考题·······················································································16
第2章 工程造价费用构成及组价原理 ······························································17
2.1 业主方建设项目工程造价构成 ························································17
2.1.1 业主方建设项目工程造价的费用构成 ·····································18
2.1.2 业主方建设项目工程造价的资产划分构成 ·······························20
2.2 承包方建筑安装工程造价构成 ························································20
2.2.1 承包方建设成本与工程造价的关系 ········································20
2.2.2 按生产要素划分的建筑安装工程费用构成 ·······························22
2.2.3 按清单组价划分的建筑安装工程费用构成 ·······························30
2.3 建筑安装工程造价的组价原则及组价程序 ·········································38
2.3.1 工程计量与工程计价 ··························································38
2.3.2 建筑安装工程概预算造价的组价 ···········································39
2.3.3 工程量清单的组价 ·····························································41
本章思考题·······················································································41
第3章 建设项目决策阶段造价管理 ·································································43
3.1 建设项目投资决策阶段概述 ···························································44
3.1.1 建设项目投资的主体 ··························································44
3.1.2 建设项目投资决策的流程 ····················································45
3.2 建设工程项目总投资估算 ······························································47
3.2.1 建设项目投资估算概述 ·······················································47
3.2.2 建设项目总投资的内容 ·······················································48
3.2.3 建设项目投资估算的内容 ····················································49
3.2.4 建设项目总投资估算的基本原则 ···········································52
3.2.5 静态投资估算 ···································································53
3.2.6 动态投资估算 ···································································58
3.2.7 流动资金估算 ···································································59
3.3 建设项目投资估算文件的编制 ························································61
3.3.1 投资估算文件的编制内容 ····················································61
3.3.2 投资估算表的编制 ·····························································63
本章思考题·······················································································70
第4章 建设项目设计阶段概算管理 ·································································72
4.1 建设项目设计阶段的工程造价管理概述············································72
4.1.1 项目设计阶段工程造价的意义 ··············································72
4.1.2 项目设计阶段工程造价管理的内容 ········································73
4.1.3 设计阶段造价控制的措施和方法 ···········································74
4.2 建设项目设计方案技术经济比较 ·····················································81
4.2.1 建设项目设计方案选择的经济分析方法 ··································82
4.2.2 建设项目设计方案选择的技术指标分析 ··································87
4.3 设计概算的编制 ··········································································94
4.3.1 设计概算的含义 ································································94
4.3.2 单位工程概算编制的内容 ····················································97
4.3.3 单项工程综合设计概算的编制 ··············································99
4.3.4 建设项目总概算的编制 ······················································102
4.3.5 概算定额与概算指标综合应用 ·············································104
本章思考题······················································································112
目 录
V
第5章 工程定额与施工图预算管理 ·······························································113
5.1 工程定额概述 ············································································113
5.1.1 建筑工程定额概念及分类 ···················································113
5.1.2 定额时间的构成 ·······························································118
5.2 施工定额 ··················································································122
5.2.1 施工定额概述 ··································································122
5.2.2 施工定额消耗量 ·······························································124
5.2.3 机械台班定额消耗量 ···························································125
5.2.4 材料定额消耗量 ·······························································127
5.3 预算定额 ··················································································129
5.3.1 预算定额消耗量 ·······························································129
5.3.2 预算定额基价 ··································································132
5.3.3 预算定额单位估价表 ·························································135
5.4 施工图预算的主要方法 ································································140
5.4.1 施工图预算概述 ·······························································140
5.4.2 施工图预算的编制方法 ······················································144
本章思考题······················································································147
第6章 招标阶段业主方工程造价管理 ····························································148
6.1 工程建设招投标市场概述 ·····························································149
6.1.1 国内工程招投标市场 ·························································149
6.1.2 工程项目业主招标概述 ······················································150
6.2 业主方招标管理 ·········································································153
6.2.1 业主方招标的工程范围 ······················································153
6.2.2 公开招标与邀请招标 ·························································155
6.2.3 业主方公开招标程序管理 ···················································156
6.3 业主方工程量清单招标文件构成 ····················································160
6.3.1 资格预审文件 ··································································160
6.3.2 招标文件 ········································································162
6.4 业主方招标控制价的构成 ·····························································164
6.4.1 工程量清单概述 ·······························································164
6.4.2 招标控制价概述 ·······························································165
6.4.3 招标控制价的编制 ····························································168
6.5 业主方工程量清单招标的风险责任管理 ···········································176
6.5.1 业主方招标的合同计价模式 ················································176
6.5.2 工程量清单计价模式下的业主风险管理 ·································178
本章思考题······················································································181
第7章 投标阶段承包方工程报价的编制 ·························································182
7.1 承包方投标文件构成 ···································································182
7.1.1 承包方工程项目投标文件构成 ·············································182
7.1.2 承包方投标报价的文件编制 ················································184
7.1.3 工程量清单表构成 ····························································185
7.1.4 工程量清单总价构成 ·························································185
7.2 分部分项工程量清单的编制 ··························································186
7.3 措施项目清单表的编制 ································································194
7.4 其他项目清单的编制 ···································································197
7.5 规费与税金清单 ·········································································200
本章思考题······················································································206
第8章 施工阶段工程价款结算管理 ·······························································207
8.1 工程价款结算 ············································································207
8.1.1 工程价款结算的主要内容 ···················································207
8.1.2 工程预付款的支付与返还 ···················································209
8.2 工程进度款 ···············································································212
8.2.1 工程进度款结算 ·······························································212
8.2.2 工程价款的价差调整 ·························································218
8.2.3 工程竣工结算 ··································································220
8.3 工程量清单价款结算 ···································································225
8.3.1 工程量清单价款结算范围 ···················································225
8.3.2 工程量清单价款结算一般规定 ·············································227
8.4 工程价款结算的索赔管理 ·····························································235
8.4.1 工程索赔概述 ··································································235
8.4.2 项目工期索赔管理 ····························································236
8.4.3 费用索赔管理 ··································································238
本章思考题······················································································244
第9章 建设项目竣工决算 ···········································································246
9.1 竣工决算概述 ············································································247
9.1.1 竣工决算概念 ··································································247
9.1.2 竣工决算编制的内容 ·························································249
9.2 建设项目竣工财务决算报表编制 ····················································251
9.3 新增资产的确定 ·········································································258
9.3.1 新增流动资产范围 ····························································258
9.3.2 共同费用的分摊 ·······························································260
本章思考题······················································································264
目 录
第10章 工程造价信息化管理 ·······································································265
10.1 云计价概述 ·············································································266
10.1.1 云计价平台概述 ······························································266
10.1.2 云计价平台的信息化造价管理 ············································268
10.1.3 云计价平台的计价模式 ·····················································270
10.2 BIM5D信息化管理 ···································································271
10.2.1 BIM定义及相关理论························································271
10.2.2 BIM5D下的成本管理应用 ·················································271
本章思考题······················································································273
参考文献····································································································274